Projects


Please click here to view a more detailed noteworthy project list.
SKECHERS

industrial

 

Skechers is a 1,800,000 square foot distribution facility completed in 2010.  This facility includes over 1,700,000 square feet of storage capabilities, 20,000 square feet of office (including 10,000 square feet of second story office), and a factory retail store.


In addition, the facility included two MFL walls, and a roof system designed for roof supported conveyers and a future solar system.

MINIMED

office/retail

 

Minimed is a state of the art 500,000 square foot two-story steel frame building which included numerous clean rooms, a central plant, process piping, theater with stadium seating, and floor and roof supported processing equipment.


There were many structural challenges inherent in the design of this project.  Kramer Engineering worked very closely with the selected contractor to ensure a successful project within the client’s stated budget.

STATER BROS

industrial

 

Kramer Engineering was asked to redesign this project with the goal of reducing the construction cost.  Collaborating with Oltmans Construction and their team, we were successfully able to significantly reduce the cost of construction.


This campus facility consisted of a 250,000 square foot, two story steel frame/tilt-up corporate office building; 1,200,000 square foot dry storage building; and an 800,000 square foot cooler/freezer building.  In addition, there were a number of smaller structures that we were able to redesigned to reduce cost.